Endeavour Silver Corp. logo EXK - Endeavour Silver Corp.

Price: -- -- | CONSENSUS: Buy DETAILS
STRONG
BUY
0
BUY 11
HOLD 2
SELL 1
STRONG
SELL
0
| PRICE TARGET: $17.00 DETAILS
HIGH: $17.00
LOW: $17.00
MEDIAN: $17.00
CONSENSUS: $17.00
UPSIDE: 123.98%
AlphaVal

AlphaVal

Deterministic, archetype-aware fair value

Other Commodity Producers 80% confidence

Primary model: FCF at Commodity Price Scenarios

Valuation Signal Overvalued Strong
Trading 132.6% above fair value
Current Price $7.59
Bear Case $1.79 76.5% downside ($1.79 - $7.59) / $7.59 = -76.5% FCF −30% × 12x
Fair Value $3.26 57.0% downside ($3.26 - $7.59) / $7.59 = -57.0% Current FCF × 15x
Bull Case $5.14 32.3% downside ($5.14 - $7.59) / $7.59 = -32.3% FCF +30% × 18x

Adjust Assumptions

0.0%
15.0x

Key Value Driver

Commodity price outlook and production volume

Implied Market Multiple 34.3x

Plain-Language Summary

At current commodity prices with a 15x EV/FCF multiple, intrinsic value is $3.26 per share. Range: $1.79 to $5.14.

Analyst Consensus (External Reference)

Never blended into the bear/base/bull estimates above -- shown only as an outside comparison.

Average Target (14 analysts) $17.00
Analyst Range $17.00 – $17.00
Divergence from AlphaVal 81%

Warnings

ℹ Demand trends (construction, electric vehicles, food production) matter more than supply headlines. Focus on who's buying the commodity and why.
⚠ Mines and reserves eventually run out. Standard models undercount this risk — the company must keep finding or buying new resources just to maintain its value.
ℹ Wall Street's average price target is $17.00 (from 14 analysts). Our estimate is 81% below the consensus -- consider that gap carefully.
⚠ This stock is 50% below its 52-week high, with weak or declining earnings. That combination often signals real trouble, even though the valuation below is based on other fundamentals.

Key Risks

  • AISC vs. cash cost distinction: always use AISC for breakeven analysis
  • Single-asset companies carry significantly higher risk — widen scenario range
  • Mine permitting takes 10-20 years — growth optionality often priced in optimistically